Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13686683

- Product Categories
- Friendly Links
- home > Supply > High-pressure injection pump | Churning-strong reinforcement rig | Liuzhou injection pump
Information Name: | High-pressure injection pump | Churning-strong reinforcement rig | Liuzhou injection pump |
Published: | 2015-04-19 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | High-pressure injection pump Scope: 1. various buildings and underground concrete cracks, expansion joints, construction joints, structural joints plugging seal. 2. Geological Drilling Project drilling Wall plugging reinforcement. 3. hydropower project reservoir dam grouting piles supporting the injection pump, plugging cracks in the tunnel, seepage, dam seepage reinforced concrete cracks. 4. Subway, tunnel, culverts, sewage treatment pond, concrete cracks leak water jet pump, with water plugging. 5. basements, underground garages, underground passages, concrete cracks leak water, with water plugging. 6. Roof concrete slab crack, wall pipe, wall, leakage of water, with water plugging. 7. Concrete structures, beams, columns, structural cracks board, high-pressure injection of epoxy resin. Code piling construction work: 1, not entirely reliable place before the completion of the preparatory work and are not allowed to start the high-pressure injection pump diesel hammer, diesel hammer should ensure that no foreign body inside, to prevent accidents. 2, the lower piston extends downward when allowed to start the diesel hammer to prevent damage to the connecting flange and the lower cylinder. 3, diesel pile hammer from the rack rails or parked on skids, are not allowed to start the diesel hammer. 4, should take measures to prevent playing eccentric pile, if found during construction must be corrected immediately. 5, if the piston every hit 10 times, sinking piles total (ie, the degree of penetration) of less than 20mm, must stop immediately, otherwise it can easily cause fatigue fracture under the piston. 6, the penetration of the pile if smaller, should be checked on the piston rebound is too high, and regulating every diesel hammer blow energy or parking. 7, always check the diesel hammer guide plate, landing gear attachment screws guide block, according to the provisions of twisting torque requirements tighten. Diesel hammer guide plate, guide portion gear guide block wear or deformation must be replaced immediately. 8 Do not use rail deformation or excessive wear of the pile frame, in order to avoid accidents. 9, piling operations must strictly observe the "diesel hammer manual" provides tilt range. 10, diesel pile hammer or signs of damage or have been damaged, it must be immediately stopped. Churning rig high pressure injection pump | Churning-strong reinforcement rig | Liuzhou injection pump provided by the Tianjin-strong high-pressure pump Limited. Tianjin-strong high-pressure pump Limited (www.tjjuqiang.com) is Tianjin, piling machinery leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Churning rig poly strong leadership with the staff warmly welcome all inquiries negotiations to create a strong jet grouting rig gather a better future. |
Admin>>>
You are the 31860 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin-strong high-pressure pump Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31860 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin-strong high-pressure pump Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility