Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13686683

- Product Categories
- Friendly Links
- home > Supply > Soft ground tunneling, Zhaotong soft foundation treatment, poly strong jet grouting rig set how much money
Soft ground tunneling, Zhaotong soft foundation treatment, poly strong jet grouting rig set how much money
Information Name: | Soft ground tunneling, Zhaotong soft foundation treatment, poly strong jet grouting rig set how much money |
Published: | 2015-05-03 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | 1 rig safety rules, before the next drill rig to check whether the channel soft ground treatment works well, depth and rock drilling must be clearly the case, you must check the next diamond drill wear, the drill pipe for blockages, drill Knot whether injury. 2, drill, at least three people with one person operating the rig, plus one rod, one grasp opening, avoiding falling into holes drilled hole fast. To stop the drill rig overtime, the whole is hit from the stop position. Such as the use of ladders should be placed firmly on a ladder operations, there should be someone good help ladder, or with wire tied to a ladder and other fasteners. 3. Check carefully before to drill oil rope hoist, include references, a damaged must be promptly replaced, to have the time to drill at least three people with one person operating the rig, a person in charge of unloading drill pipe, one of the opening, when the hole When water conditions top drill large presence of soft foundation treatment, to use the rig to drill vertical, the operator should attach serious, with slip control drill, impact drill to avoid or shed roof beams, construction workers are not allowed to face the opening, Top high pressure water to prevent drilling hurt, when you must use a fork to drill pad. 4, to drill, winch operations must be stable, unloading lever must always pay attention to opening and operation of dams hoist soft foundation treatment to prevent rejection rope squeeze hands hurt. 5, each class construction workers enter the workplace, we must always pay attention to the case of the engine room roof, shed beam supporting the case, according to the order has the inside out, have to strictly implement the "knock state asked top" system, there is danger of discovery rock live rock or roof separation, should be promptly removed with a long-handled tool when dealing with problems, there is a man at the side care, and to ensure the smooth flow of retreat, indeed endangering personal safety, they can withdraw immediately. 6, drilling and grouting parallel operation, they should be careful opening the pressure gauge and high pressure pipe to drill drill rig personnel, when grouting pressure reaches 4.0Mpa above or grouting pressure instability, non-parallel appeared in the room work to prevent accidents caused by mud spray people. DJM machine restructuring of high pressure jet grouting construction stakeout and cloth hole construction in cement mixing pile wall axis as the basis, the translation direction to the lake side 30cm, Wall as a high jet axis, the axis of the hole by 1.3m Photos from the soft-processing equipment, measuring holes, and well marked with stakes, compiled on hole number, serial number. |
Admin>>>
You are the 31860 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin-strong high-pressure pump Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31860 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin-strong high-pressure pump Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility